If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies). Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely.